Environment Agency cuts waste red tape
Contents |
[edit] The future of recording waste transfers
The Environment Agency (EA) has announced that it will no longer enforce certain waste transfer documentation in England when contractors drop trade waste off at wholesalers. The change coincides with wider, ongoing discussions between industry bodies such as Recolight and ECA with the EA and Defra, regarding the future of recording waste transfers.
According to ECA’s Director of CSR Paul Reeve, “In practice, this change should make it easier for contractors to ensure that various commercial waste (such as electrical and lighting waste) is properly collected and recycled, at no cost to the contractor”.
[edit] Regulatory Position Statement (RPS) 283
The change was announced this autumn in Regulatory Position Statement (RPS) 283. The RPS states that customers dropping off business waste (such as WEEE) at wholesaler sites will not be challenged by the EA if they do not supply a Waste Transfer Note, or - even in the case of hazardous waste like various waste electricals and lamps - a Hazardous Waste Consignment Note.
Significantly, the RPS does not change the law but instead means that enforcement action will not be taken. There are also conditions attached to the RPS*. For example, the activity of transporting and dropping off the waste must be otherwise legally compliant, and notably not pollute the environment or harm human health. Further, contractors should only drop off waste that has arisen as a result of their own commercial activities.
[edit] Non-waste framework Directive (NWFD) exemption 4
Wholesaler collection points must similarly comply with all other relevant waste-related legislation and
The waste collection point must be operated in line with non-waste framework Directive (NWFD) exemption 4.
The RPS will be in force for three years after which it will be reviewed.
This article appears on the ECA news and web blog site as "Environment Agency cuts waste red tape" dated November 15, 2023.
--ECA
[edit] Related articles on Designing Buildings
- Articles about electricity.
- Consumer electronics.
- Consumer unit.
- ECA articles.
- Electrical appliance.
- Electrical equipment.
- Electrical installation.
- Electrical safety.
- Electrical system.
- Electrical and electronic equipment
- End of life potential.
- Environmental impact assessment EIA.
- Environmental plan for building design and construction.
- Planned obsolescence.
- Plastic and recycling.
- Recycling explained.
- Types of plastic in construction.
- Waste and Resources Action Programme WRAP.
- Waste electrical and electronic equipment WEEE.
- Waste Electrical and Electronic Equipment Directive.
- Waste hierarchy.
- Waste management plan for England.
Featured articles and news
CIOB student competitive construction challenge Ireland
Inspiring a new wave of Irish construction professionals.
Challenges of the net zero transition in Scotland
Skills shortage and ageing workforce hampering Scottish transition to net zero.
Private rental sector, living standards and fuel poverty
Report from the NRH in partnership with Impact on Urban Health.
.Cold chain condensing units market update
Tracking the evolution of commercial refrigeration unit markets.
Attending a conservation training course, personal account
The benefits of further learning for professsionals.
Restoring Alexander Pope's grotto
The only surviving part of his villa in Twickenham.
International Women's Day 8 March, 2025
Accelerating Action for For ALL Women and Girls: Rights. Equality. Empowerment.
Lack of construction careers advice threatens housing targets
CIOB warning on Government plans to accelerate housebuilding and development.
Shelter from the storm in Ukraine
Ukraine’s architects paving the path to recovery.
BSRIA market intelligence division key appointment
Lisa Wiltshire to lead rapidly growing Market Intelligence division.
A blueprint for construction’s sustainability efforts
Practical steps to achieve the United Nations Sustainable Development Goals.
Timber in Construction Roadmap
Ambitious plans from the Government to increase the use of timber in construction.
ECA digital series unveils road to net-zero.
Retrofit and Decarbonisation framework N9 launched
Aligned with LHCPG social value strategy and the Gold Standard.
Competence framework for sustainability
In the built environment launched by CIC and the Edge.
Institute of Roofing members welcomed into CIOB
IoR members transition to CIOB membership based on individual expertise and qualifications.
Join the Building Safety Linkedin group to stay up-to-date and join the debate.
Government responds to the final Grenfell Inquiry report
A with a brief summary with reactions to their response.